Trim piece for side of double vanity – stained and with a bit of carpentry will be in today.
Turns out Mein Frau remains upset about granite firm work. Give me a break, just because half of the sinks are the wrong color…
Purchased a plain, ten pane interior glass door and have routed out the areas for hinges. First coat of cherry stain is complete and drying. Two or three coats of a chocolate color stain remain to be applied.
Am still avoiding revisions to Chapters 12 through 15 of Golden Gate. That is my task today (or this weekend). I need to purge extraneous characters and action, concentrate on the main characters. One of the main characters is introduced in this segment of the novel.
Well, chapters 12, 13 are revised, while 14 and 15 have been restructured. I had Offspring review chapters 12 and 13 and he has extensive markups, very helpful ones – indeed.
The second coat of stain goes on the bathroom door today, and another section of porch railing gets painted. The granite firm returns today to change out one of the two master bath sinks.
Word count for Chapter 11 increased by about 420 as dialogue was improved.Trying to prepare for another critique at RWG meeting this Saturday, finish restoration of old PC, and complete master bath renovation tasks. Two other bathroom vanities are being repaired/fixed as well. It’s a busy week at Blackrock!
Well, the week is about done. Mirrors are being hung, paint is being touched up. The end of the tunnel is in sight. But, wait …
One of the newly installed vanities, far from being eggshell or off-white, is white. And several of the backsplashes don’t appear to have been sealed (they lack the sheen of the flat counter tops).
Be that as it may, the County inspector came over and performed the Final Inspection. He checked for hot water and for proper functioning of the GFCI function in the bathroom outlets. We PASSED!!!
The RWG meets this Saturday and I’ll be taking Chapter 11 of Golden Gate for the critique session. I expect I’ll get more critical, insightful comments, as the product itself is getting better.
We are at this very moment resolving issues with our granite vanity tops. Several were left very sloppily caulked, one with a mixture of white and clear caulk. One had a secondary drain plug missing. It is clear, even after having to re-cut the tops so there was no overhang, which meant quality was not in the mind of the installers.
I did manage yesterday to get the sinks in the master bath hooked up and functional - with no leaks. Hooray!!!
I finished reworking Chapter Ten, and a word count reflects I added just over 880 words. So much for dialogue.
My old PC died, slowly and painfully, over the past month. It kept freezing up. I still am unsure whether it is the hard drive, the motherboard, or the video card. I plan to replace the video card today, as well as keep transferring the data (by USB drives).
I bought a new, low end Dell Inspiron 570 computer, which has plenty of capability to do what I need, WORD documents and photo manipulation.
Here is the Master Bath renovation status update –
Today the granite vanity top installers came. It turns out that, somehow, the fact that we wanted no lip overhang of the granite over the under mount sink had slipped their minds. I told them to stop, and they removed the three granite tops back to their shop. I understand they will be either re-cut or ground down so there’s no lip. This is important because a lip will allow mold to grow unseen. So I now wait to see if the tops will come back today or some other day, and as requested.
The shower tile was completed yesterday, with the exception of a minor repair of the grout on one side of the shower pan.
The glass folks are enroute even as I write this post, so within an hour hopefully we’ll have shower doors and actually be able to use our shower. The demo started back in May, so it has been a while.
Offspring is now back at the campus, and we plan to drive to see him and eat together this weekend.
The old vanity tops have been recycled through a Yahoo Group titled Freecycle. Check it out; it offers a way to give away serviceable items.
Hardly any work on Golden Gate has taken place this past week, other than putting some notes together on ideas as to how to rewrite Chapter Ten (again). Maybe manana!!!