Total Pageviews

Friday, July 15, 2011

Progress on bathroom renovation

Hi all,

Not much progress on the novels, but the bathroom renovation is progressing. The rough in plumbing inspection PASSED. Have drywalled the space and the florr tiles will be done this coming week. Had to rehinge the doors on the tall storage cabinet and am now concerned I may have gotten ahead of myself with drywalling, as (apparently) I needed a rough in electrical inspection first.

Have a call in to the inspector (who has seen all the wiring and even commented on it, and suggested one change) when he did the plumbing inspection. Sure hope I don't have to tear the drywall down at this stage.

Keep your fingers crossed.

No comments:

Post a Comment